Image collection
Vereina Tunnel Opening 1999
The breakthrough in the construction of the Vereina tunnel of the Rhaetian Railway took place on 26 March 1997. Construction work on the tunnel began in 1991 and lasted eight years. On 19 November 1999, the winter-safe and fast connection to the Lower Engadine was opened to traffic. (luk)
50 Objects
Download lightbox content as ZIP file
Downloads the entire content of the lightbox as a compressed ZIP file. Lightboxes with many objects are split into several ZIP files to keep the file size manageable.
Attention: Royalty Free images and images that require clearance are not included in the ZIP file. Please download them separately.
Instructions